London Borough of Hillingdon

Kershaw Insulation undertook retro-fit insulation works on four tower blocks in the London Borough of Hillingdon. 

Following surveys of four tower blocks, it was decided by Hillingdon London Borough Council for precautionary measures to undertake additional fire safety.

The works were carried out to all four blocks over a period of fewer than 8 weeks, which included an allowance for making good the site, pointing all drill holes in the brickwork and leaving the site in a clean and tidy state.